September 2017


Chetton Active Friends – 2/10/17 2pm

Recently Chetton Parish Council applied for a grant on behalf of Chetton Village Hall to set up a community program.
Chetton Active Friends will be open to anyone wanting to improve their wellbeing. We are offering gentle exercise and refreshments for those who would like to get out of the house more and meet people.
The program will start on Monday 2nd October at 2pm and will be free of charge apart from an initial registration fee of £5.00.
If you know of anyone who wishes to attend but is without transport, this may be able to be arranged.
It is a flexible program and if people wish to come along just to socialise that is ok too.
We know there are many people who would benefit from this and if you could help spread the word, it would be much appreciated.
If anyone wishes for further please contact us via the enquiry form.
Many thanks
Sue Bayliss

Bridgnorth Bypass Update 7th Sept 2017

A458 Improvement update

Improvement works on the A458 Bridgnorth bypass continue.

The work on the A458 and the roundabout approaches between the A458/B4373 (Wenlock Road) junction and the Stourbridge Road roundabout remain due to finish by 10 November.

Works to the safety barriers, street lighting and drainage over the entire site have been ongoing. These works will continue into the beginning of October during daytime hours. This will involve further periods where both the Ludlow Road Roundabout, the Kidderminster Road Roundabout and the Wenlock Road Junction will be controlled under traffic signals.

Resurfacing of the Ludlow Road and Kidderminster Road roundabouts will continue with a closure on the Ludlow roundabout on the evening of the 8th September and on the Kidderminster road roundabout on the evening of the 11th September. For further details, please see the road closure information below. 24hour closures will occur the 15th September and into week commencing 18th September to allow final surfacing (see Below).

Resurfacing of the A458 itself will be ongoing during night time road closures into mid-September.

Taking advantage of the night time closures on the A458 itself the works to the deck joints on Bridgnorth River Severn Bridge will begin on the evening of the 11th where the existing joints will be replaced on one running lane at a time. This work will be ongoing during night time road closures until mid-October. During daytime traffic signals will be in place with one lane closed.

All night time road closures will take place between the hours of 20:00 and 06:00. Local diversions will be in place and signed at all times.


Road Closures

Below is a fortnighty look ahead giving details of the forthcoming road closures associated with the Bridgnorth Bypass Project.

20:00 8th September to 06:00 9th September

Ludlow Road Roundabout North side closed for resurfacing operations.

No access/egress onto B4364 towards Bridgnorth Town Centre.

Local diversion in place via Wenlock Road and the B4364 Ludlow Road.

All other roundabout exits/entries are open to traffic.

 

20:00 11th September – 06:00 12th September also

20:00 12th September to 06:00 13th September also

20:00 13th September to 06:00 14th September also

20:00 14th September to 06:00 15th September also

20:00 15th September to 06:00 16th September also

20:00 19th September to 06:00 20th September also

20:00 20th September to 06:00 21st September also

20:00 21th September to 06:00 22nd September also

20:00 22nd September to 06:00 23rd September

The A458 (bypass) between the Kidderminster Road Roundabout and the Ludlow Road Roundabout will be closed for resurfacing operations.

Diversion in place via town centre, the B4364, the B4373 and the A442.

 

06:00 15th September – 06:00 16th September

Kidderminster Roundabout East side closed for resurfacing operations.

No access/egress onto A458 towards Stourbridge.

Local diversion in place via A442 Kidderminster Road and Stourbridge Road.

All other roundabout exits/entries are open to traffic.

 

06:00 18th September – 06:00 19th September

Kidderminster Roundabout West side closed for resurfacing operations (No access/egress onto A458 towards Shrewsbury)

The A458 (bypass) between the Kidderminster Road Roundabout and the Ludlow Road Roundabout will be closed for Severn Valley Railway Bridge works.

Between 20:00 and 06:00 the diversion signposted will be via the town centre, the B4364, the B4373 and the A442.

All other times a diversion via A458, A4169 (Much Wenlock) and the A442 (Telford) will be signposted.

 

06:00 19th September – 06:00 20th September

Ludlow Road Roundabout north side closed for resurfacing operations

No access/egress onto B4364 towards Bridgnorth Town Centre.

Local diversion in via Wenlock road will be in place.

 

06:00 20th September – 06:00 21st September

Ludlow Road Roundabout south side closed for resurfacing operations

No access/egress onto B4364 towards Ludlow.

Diversion in via B4364, A49 (Ludlow), B4365, B4368 and the A458 (Morville) will be in place.

Regards

 

Hedd Wyn Jones

Senior Engineer


Bridgnorth Bypass Update 4th Sept 2017

A458 Road Closure Update.

Below is a fortnight look ahead giving details of the forthcoming road closures associated with the Bridgnorth Bypass Project.

20:00 4th September to 06:00 5th September

  • Kidderminster Roundabout East side closed for resurfacing operations.
  • No access/egress onto A458 towards Stourbridge.
  • Local diversion in place via A442 Kidderminster Road and Stourbridge Road.
  • All other roundabout exits/entries are open to traffic.

20:00 5th September to 06:00 6th September

  • Ludlow Road Roundabout South side closed for resurfacing operations.
  • No access/egress onto B4364 towards Ludlow.
  • Diversion in place via the B4368, the B4368, the A458 and the A49.
  • All other roundabout exits/entries are open to traffic.

20:00 6th September to 06:00 7th September also

20:00 7th September to 06:00 8th September

  • The A458 (bypass) between the Kidderminster Road Roundabout and the Ludlow Road Roundabout will be closed for resurfacing operations.
  • Diversion in place via town centre, the B4364, the B4373 and the A442.

20:00 8th September to 06:00 9th September

  • Ludlow Road Roundabout North side closed for resurfacing operations.
  • No access/egress onto B4364 towards Bridgnorth Town Centre.
  • Local diversion in place via Wenlock Road and the B4364 Ludlow Road.
  • All other roundabout exits/entries are open to traffic.

20:00 11th September – 06:00 12th September also

20:00 12th September to 06:00 13th September also

20:00 13th September to 06:00 14th September also

20:00 14th September to 06:00 15th September also

20:00 15th September to 06:00 16th September

  • The A458 (bypass) between the Kidderminster Road Roundabout and the Ludlow Road Roundabout will be closed for resurfacing operations.
  • Diversion in place via town centre, the B4364, the B4373 and the A442.

20:00 15th September – 06:00 16th September

  • Kidderminster Roundabout East side closed for resurfacing operations.
  • No access/egress onto A458 towards Stourbridge.
  • Local diversion in place via A442 Kidderminster Road and Stourbridge Road.
  • All other roundabout exits/entries are open to traffic.

 

Hedd Wyn Jones

Senior Engineer


Bridgnorth Bypass Update 1st Sept 2017

A458 Improvement update

Improvement works on the A458 Bridgnorth bypass continue.

The work on the A458 and the roundabout approaches between the A458/B4373 (Wenlock Road) junction and the Stourbridge Road roundabout are due to finish by 10 November.

Works to the safety barriers, street lighting and drainage over the entire site have been ongoing. These works will continue into the beginning of October during daytime hours. This will involve further periods where both the Ludlow Road Roundabout, the Kidderminster Road Roundabout and the Wenlock Road Junction will be controlled under traffic signals.

Resurfacing of the Ludlow Road and Kidderminster Road roundabouts will begin initially on the evening of the 4th September where half the roundabouts will be resurfaced to a temporary running course during night time road closures.

Resurfacing of the A458 itself will begin on the evening of the 6th September and will be ongoing during night time road closures for the next fortnight.

Taking advantage of the night time closures on the A458 itself the works to the deck joints on Bridgnorth River Severn Bridge will begin on the evening of the 11th where the existing joints will be replaced on one running lane at a time. This work will be ongoing during night time road closures until mid October. During daytime traffic signals will be in place with one lane closed.

All night time road closures will take place between the hours of 20:00 and 06:00. Local diversions will be in place and signed at all times.

Regards

Hedd Wyn Jones
Senior Engineer